Contact

Building Safety Applications, Agreements and Forms

Print
Press Enter to show all options, press Tab go to next option

Fees and Charges

Applications

Forms, Agreements and Checklists

Informative Documents

FAQs


 Applications

 Alternate Construction Method Application 

 Building Construction Permit Application

 Commercial Certificate of Occupancy Application

 Commercial Mechanical Permit Application

 Commercial Plumbing Permit Application

 Demolition Permit Application

 Demolition Permits Policy & Procedure

 Electrical Permit Application

 Manufactured Home Placement Application

 Permit Extension Application

 Residential Mechanical Permit Application

 Residential Plumbing Permit Application

 Revisions and Deferred Submittals Application

 SDC Estimate Request Application

 SDC Supplemental Application

 Septic Authorization Application

 Site Improvement Permit Application

 Solar PV, Solar Hydronic & Wind Generation Systems Permit Application

Checklist for Solar Photovoltaic and Solar Hydronic Systems - Prescriptive Installations is now attached to the back of this application. Please complete both parts for prescriptive installations.

 Water Meter Application


 Forms, Agreements and Checklists

 Access Controlled Egress Systems Checklist

 Accessibility Building Survey

 Commercial Submittal Checklist

 Deferred Submittal Agreement

 Emergency Responder Radio Coverage Checklist

 Fire Alarm Checklist

 Fire Alarm Panel, Communicator, or Dialer Replacement Worksheet

 Fire Sprinkler Affidavit

 Fire Sprinkler Checklist

 Grease Interceptor Checklist

 High Efficacy Lighting Form

 Lighting Worksheet

 Manufactured Dwelling Checklist

 Moisture Content Form

 Phased Construction Agreement

 Power Assisted Manual Device Installation Checklist

 Records Request Form

 Residential Energy New Construction/Large Additions Checklist

 Residential Energy Remodels/Small Additions Checklist

 Residential Submittal Checklist

 Site Improvement Submittal Requirement Checklist

 Spa Questionnaire  

 Special Inspection Agreement

 Statement of Compliance for Accessibility

 Statement of Compliance for Stormwater Management

Effective June 1, 2018. This will be required during plan submittal for all residential construction and additions.

 Temporary Change of Occupancy Submittal Requirements Checklist

 Type 1 Hood Permit Checklist

 

 Informative Documents

 2019 Oregon Structural Specialty Code (OSSC) to be adopted, effective October 1, 2019

  Accessible Parking Standards 

  Approved Fire Vault Example 

 Asbestos Information for Contractors & Business Owners

 Asbestos Information for Homeowners

 Asbestos Survey Requirements

  Commercial Shell and Tenant Improvement Permits

  Construction Valuation Table

  Conversion from or Removal of Bedroom in Dwelling

  Electrical Plan Review Information Sheet 

  Electrical Requirements for Residential Mechanical Installations

  Expedited Processing Policy for Affordable Housing

  Frequent Permit Issuance Delays (NEW)

  Residential Energy Efficiency Option 5 (NEW)

  Residential Fill Lots - Geotechnical Guidance

  Retaining Wall Standard Operating Procedure (Building Safety)

  Retaining Wall Standard Operating Procedure (Engineering)

  Special Inspection for Fire Stopping (NEW)

  When is an Electrical Permit Required

  When is a Residential Plumbing Permit Required

FAQS

  • Building Safety Permits

    • What are the requirements to apply for and permit a Tenant Improvement before or concurrently with a Shell Building permit?

    • What is required for changing lighting fixtures in a commercial facility?

Footer Broken Top Three Sisters