Private Development Engineering Services Applications & Forms

Press Enter to show all options, press Tab go to next option

Download the information and forms that you need by clicking on the link(s) below:  

Submit all applications, forms, and questions regarding private development engineering to: 

Questions: Call (541) 388-5580, ext 4 or Email:


Pre-Qualification Contractor Forms

The City of Bend is revising the “Approved Contractor” program and implementing the Pre-Qualified Contractor program. In accordance with Code section 3.40.020 work in the City’s Right-of-Way must be performed by a qualified right-of-way (ROW) contractor.

All currently approved ROW contractors will need to apply for Pre-Qualification under the new program. The application period will be open until December 15th 2017 and contractors can reapply at any time. During this time, the $250 application fee will be waived. The new program fees will be in affect starting January 1, 2018 and if a contractor is not complete by the deadline, they will be removed from the Pre-Qualified Contractor list and will have to pay fees and reapply. 

The City will be holding an application workshop on October 19th 2017 from 3:00 pm to 5:00 pm in Council Chambers at City Hall to answer questions and provide additional guidance. Feel free to call (541-388-5580) or email your questions to

 Pre-Qualification Contractor Policy
 Pre-Qualification Contractor Instructions
 Pre-Qualification Contractor Application
 Debarment Check Document
 Bonding Letter Example


Applications and Forms
 Change Request Form
 Construction Plan Review Application
 Dedication Deed / Quitclaim Deed Application
 Fire Flow Test
 Grading Drainage Permit Review Application
 Master Plan Agreement Public Improvement Acceptance Application
 Public Improvement Acceptable Application 
 Revocable Permit
 Rock Crushing Permit
 Right-of-Way Permit Application
 ROW Permit Street Cut Exception Form
 SDC Appeal Form
 SDC Estimate Request Application
 Septic Authorization Form 
 Transportation Review Application
 Tree Removal and Planting Permit Application
 Water and Sewer Analysis

 Wood River Village - Sewer Feasibility Process



Right-of-Way Permit Types

Right-of-Way Requirements - Tier 1

Right-of-Way Requirements - Tier 2

Right-of-Way Traffic Control Plans


Part V - Construction Observation and Inspection Requirements revised 2015
            Technical Guidance - Concrete Cold Weather Plan


ADA Curb Ramp Assessment
System Development Charges


Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer

If you need assistance with any document, form, etc.,
you may request assistance from the Accessibility Program.