Water Reclamation Facility - Solids Handling Improvement Project

Print
Press Enter to show all options, press Tab go to next option

This project will increase the lifespan, capacity, performance, and safety of the solids dewatering process.


The City of Bend’s Water Reclamation Facility (WRF) solids handling dewatering * process has maintenance, redundancy, and operational challenges. The system is nearing capacity and there is heavy corrosion in both the building and on equipment resulting in deterioration of assets.

The objective of the Solids Handling Improvement Project is to upgrade the solids dewatering process to ensure the following:

  • Increase in dewatering performance while continuing to produce Class A biosolids

  • Increase capacity

  • Increase asset lifespan

  • Provide safe work environment for staff


 * The dewatering process removes water from the solids before they are land applied.

Project Location

 

 

 

Project Estimated Timeline

  • Predesign development June 2018 - November 2018
  • Construction anticipated Summer 2019 – Winter 2019

Question / Concerns

Please contact:

Brittany Park, Associate Engineer

bpark@bendoregon.gov 541 330-4000

 

Joshua Robertson, P.E. Principal Engineer

jrobertson@bendoregon.gov 541 330-4000

.

Footer Broken Top Three Sisters