South Mirror Pond Parking Lot Redesign

Print
Press Enter to show all options, press Tab go to next option

Redesigning the parking lot will address the existing deficiencies and better tailor the facility for parking use, business service, and to deter other uses that are not intended for this area.

There are a number of deficiencies, both functional and condition related, with the existing parking lot.  In addition, the South Mirror Pond Parking Lot has become a popular gathering place for unintended and unwanted uses. Specific locations in the parking lot have confirmed criminal activity. This poses a number of safety concerns, as well as detracts from the overall intended use of this public parking area.


CONSTRUCTION UPDATES

  • Parking lot closed for construction beginning the week of March 25, 2019

PROJECT LOCATION

PROJECT GOALS

  • Increase safety and access to trash enclosures
  • Improve ADA accessibility and overall pedestrian access to Mirror Pond Plaza
  • Update signage for paid parking
  • Improve circulation
  • Provided oversize-vehicle parking
  • Increase garbage collection efficiency
  • Preserve the large ponderosa tree on site
  • Improve entrance and exit to eliminate “wrong-way” access
  • Increase the size of drive aisles and parking stalls
  • Install required landscaping and necessary irrigation
  • Improve lighting and visibility

PROPOSED DESIGN

PROJECT ESTIMATED TIMELINE

  • Design development January 2018 - October 2018
  • Parking lot closed for construction beginning the week of March 25, 2019
  • Construction to be completed early June 2019
Footer Broken Top Three Sisters

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer

If you need assistance with any document, form, etc.,
you may request assistance from the Accessibility Program.