SW Sewer Basin Study & SW Phase 2 Sewer Extension

Print
Press Enter to show all options, press Tab go to next option

A project location map identifying the existing gravity sewer and deficient segments between Brookswood Blvd and Highway 97. The map also identifies the areas of phase 1, phase 2, septic systems, Romain Village pressure systems, undeveloped, and the Urban Growth Boundary.

An alternatives analysis will provide a basis for the design and construction of a new sanitary sewer trunk line and the decommissioning of individual aging pump stations. This project will address existing deficiencies and future capacity for Bend's southwest sewer basin.


Multiple deficiencies along the Amethyst/Mahogany sewer line were identified in the 2014 Collection System Master Plan and the 2018 Public Facilities Plan. Additionally, multiple residential private septic systems, along with undeveloped parcels along Highway 97 and the UGB expansion areas are currently unsewered. Lastly, the Romaine Village pressure area has been identified as problematic, with aging individual pump stations.

An alternatives analysis of the overall contributing basin will provide a basis for the design of a new sanitary sewer trunk, which will serve existing homes on City sewer. Additionally, this will accommodate future septic-to-sewer conversions, infill development, and the UGB expansion areas in the south side of Bend.

Phase 1 includes the replacement of 200 lineal feet of an existing sewer main along Amethyst Street that is undersized for current sewer flows.

Phase 2 involves the design and construction of a new sanitary sewer trunk that will tie into the existing system that runs along Mahogany Street. The new sewer pipe will run south along Ridge Drive and connect back into the existing system before it crosses under Highway 97. This phase will also provide the decommissioning of some of the individual pump stations located in the Romaine Village pressure area.

The United States Environmental Protection Agency logoThe Oregon Department of Environmental Quality logo
This project is funded by the Clean Water State Revolving Fund (CWSRF)


PROJECT GOALS

This project will provide a sanitary sewer collection trunk line that will serve the southwest basin of Bend, addressing existing deficiencies and future capacity.


ESTIMATED PROJECT TIMELINE

Design: March 2020 - November 2020

Construction: March 2021 - December 2021


WHAT TO EXPECT DURING CONSTRUCTION

Information will be updated and posted once project is closer to construction.


PROJECT UPDATES

No results found.

SIGN UP FOR PROJECT UPDATES

Please correct the field(s) marked in red below:

1
Name
Name
2
Email Address
 *
  1. To receive a copy of your submission, please fill out your email address below and submit.
    CAPTCHA
    Change the CAPTCHA codeSpeak the CAPTCHA code
     

    CONCEPTUAL DESIGNS/PROPOSED IMPROVEMENTS

    No results found.
    Footer Broken Top Three Sisters

    Free viewers are required for some of the attached documents.
    They can be downloaded by clicking on the icons below.

    Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer

    If you need assistance with any document, form, etc.,
    you may request assistance from the Accessibility Program.