Keep up-to-date on weekly closures and detour routes during peak construction season.


During peak construction season—typically April through October—we send out weekly road and traffic reports each Friday to help members of our community plan the quickest, safest and most reliable routes to their destinations. The weekly report is intended to provide information about various projects within City limits that impact the roadways.

 


TRAFFIC IMPACT LOCATIONS

The map below shows lane and road closures on arterials and collectors and full closures on residential streets.

Click and drag to navigate the map, or use the + or – buttons to zoom. For information about a specific, highlighted project on the map, click it and a pop-up window will appear that contains detailed information.


WEEKLY ROAD AND TRAFFIC REPORTS

Weekly Road and Traffic Report for the Week of June 1-7

Post Date:05/29/2020 12:34 PM

Weekly Road and Traffic Report

For the Week of June 1–7:

  • Slurry seal street preservation work is set to begin this week. Several residential roads will see one-day closures in Bend. This week you can expect to see crews on the northwest, northeast and southeast sides of Bend. To see if your street will be affected, head to our Street Preservation page. Our Street Preservation page also includes a full list of 2020 Street Preservation projects.
  • SE Scott Street between SE 2nd Street and SE Aune Street for fiber optic cable installation, single lane road closure with flagging, 6/1/20 - 6/3/20, 8:30 a.m. – 4 p.m.
  • NE Lafayette Avenue between 3rd Street and 4th Street for street paving, 6/1/20 - 6/2/20, 7 a.m. – 5 p.m.
  • NW 16th Street between NW Galveston Ave and NW Elgin Ave for street paving, 6/3/20 - 6/4/20, 7 a.m. – 5 p.m.
  • NW Roanoke Avenue between NW 9th Street and NW 10th Street for infrastructure installation, road closure with flagging at intersection of NW Roanoke Avenue and NW 9th street, 6/1/20 - 6/3/20, 8:30 a.m. – 4 p.m.
  • NW 13th Street between NW Kingston Avenue and NW Jacksonville Avenue for infrastructure installation, full road closure, 6/1/20 - 6/12/20, 7 a.m. – 4 p.m.

Ongoing Closures:

  • SE 15th Street between the new collector road and SE Gateway Drive for regrading of roadway, single lane closure with flagging, 5/18/20 - 6/7/20, 9 a.m. – 3:30 p.m.
  • SE Greenmont Drive between SE Desert Woods Drive and SE Hill Ridge Drive for infrastructure installation in relation to a neighborhood extension project, full road closure with local access only, began 5/4/20
  • Murphy Road between Brown Trout Place and Country Club Drive for roadwork related to Murphy Corridor project, bypass road constructed to provide westbound/eastbound traffic with minimal impacts, 4/17/20 - 06/12/20
  • King Solomon Court from SE King Hezekiah Way for infrastructure installation in relation to a neighborhood sewer extension project, full road closure with local access only, began 3/13/20
  • NE 27th Street between NE Butler Market and Jill Avenue for roadwork related to roundabout construction, full road closure with detour, 4/13/20 - 7/27/20
  • NE Butler Market Road between NE 27th Street and NE Marys Grace Lane for roundabout construction, full road closure with detour, began 4/13/20
  • SE Deschutes Market Road between NE Butler Market Road and Monticello Drive for roundabout construction, full road closure with detour, began 4/13/20
  • SE Knott Road between Brosterhous Road and SE Raintree Drive for construction of a new roundabout at Knott Road and 15th Street intersection, bypass road to be constructed with local access to Tekampe Road, began 3/16/20
  • SE 15th Street between Knott Road and the new collector road for infrastructure installation, full closure of the roadway, 12/26/20 - 7/31/20
  • NE Butler Market Road between Deschutes Market Road and Eagle Road for roundabout construction, full road closure with detour, began 4/3/20
  • SE Desert Woods Drive between Greenmont Drive and 15th Street for infrastructure installation in relation to a neighborhood sewer extension project, full road closure with local access only, began 3/11/20

Future Closures:

  • 15th Street between Desert Woods Drive to Hollis Lane for sewer infrastructure installation on the Neighborhood Extension Project, southbound lane closure with northbound lane to remain open, work begins 6/15/20.
  • Murphy Road between Brown Trout Place and Country Club Drive for roadwork related to Murphy Corridor project, road closed for westbound traffic with a detour posted and the bypass road allowing eastbound traffic, 6/11/20 - 08/31/20

Work schedules are dependent on weather conditions and other factors.

 

Contact: Kyle Thomas, Construction Manager

541-323-8519, kthomas@bendoregon.gov

 

For Street Preservation related questions: Paul Neiswonger, Streets Supervisor

541-317-3035, pneiswonger@bendoregon.gov

 

Closures and detours in Bend are updated weekly at: www.bendoregon.gov/traffic

 

Find more information about street operations at: www.bendoregon.gov/streetpreservation

 

Weekly reports can be received via email by subscribing to Weekly Road and Traffic Reports at: www.bendoregon.gov/enews

ADA wheelchair icon.

Accommodation Information for People with Disabilities  

To obtain this information in an alternate format such as Braille, large print, electronic formats, etc. please contact Anne Aurand at 541-388-5573 or aaurand@bendoregon.gov

Return to full list >>
Footer Broken Top Three Sisters

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer

If you need assistance with any document, form, etc.,
you may request assistance from the Accessibility Program.