Keep up-to-date on weekly closures and detour routes during peak construction season.


During peak construction season—typically April through October—we send out weekly road and traffic reports each Friday to help members of our community plan the quickest, safest and most reliable routes to their destinations. The weekly report is intended to provide information about various projects within City limits that impact the roadways.

 


TRAFFIC IMPACT LOCATIONS

The map below shows lane and road closures on arterials and collectors and full closures on residential streets.

Click and drag to navigate the map, or use the + or – buttons to zoom. For information about a specific, highlighted project on the map, click it and a pop-up window will appear that contains detailed information.


WEEKLY ROAD AND TRAFFIC REPORTS

Weekly Road and Traffic Report for the week of Sept. 9-15

Post Date:09/06/2019 1:02 PM

Special Event 

  • Over the Edge will be held on 9/7/19 from 6 a.m. - 6 p.m. and will close the following streets:

    • NW Lava Road between NW Franklin Avenue and NW Oregon Avenue

    • NW Minnesota Avenue between NW Bond Street and NW Lava Road 

For the Week of September 9 – 15 

  • NE Olney Avenue between NW Wall Street and NE 8th Street for milling and paving, road closure with detours, night work from 9/6/19 - 9/8/19.

  • Reed Market Road between Highway 97 and SE 3rd Street for grinding and paving, road closure with detour, night work on 9/9/19.

  • NE Conners Avenue between NE 27th Street and NE Doctors Drive for infrastructure installation, single lane closures with flaggers, 9/9/19 - 9/13/19, 7 a.m. - 7 p.m.

  • NW Minnesota Avenue between NW Wall Street and NW Lava Road for grinding and paving, road closure, night work on 9/10/19.

  • NW Colorado Avenue and SE Scott Street between NW Arizona Avenue and SE Aune Street for grinding and paving, road closure with detour, night work on 9/10/19.

  • Murphy Road between SE 3rd Street and Parrell Road for Amethyst-Mahogany Diversion Infrastructure Project installation, road closures with detours starting 9/11/19.

  • SE Davis Avenue between SE 3rd Street and SE 2nd Street for utility paving work, road closure with detour, 9/12/19, 7 a.m. - 4 p.m.

  • Powers Road Between SW Elkhorn Street and Porcupine Drive for paving, road closure with local access only, 9/12/19 - 9/13/19.

  • Rockbluff Lane between SW Elkhorn Street and SW Cliffrose Drive for paving, road closure with local access only, 9/12/19 - 9/13/19. 

Ongoing Closures 

  • Brosterhous Road between American Lane and News Lane for infrastructure installation, road closure with detours, until 9/20/19.

  • SE White Tail Street between Brosterhous Road and Brentwood Avenue for infrastructure installation, road closure with detour, until 9/20/19.

  • NE 4th Street between NE Addison Avenue and NE Xerxes Avenue for infrastructure installation, road closure with detour, until 9/30/19.

  • SE 3rd Street between Highway 97 and Murphy Road for Amethyst-Mahogany Diversion Infrastructure Project access, road closure with detour, until 10/18/19, night work from 8 p.m. - 5 a.m.

  • 15th Street between Chloe Lane and Gateway Drive for Stage One of Murphy Corridor Improvements Project, southbound lane closure with detour, until 10/31/19. 

Upcoming Closures 

  • Cooley Road between Highway 97 and Hunters Circle for railroad crossing repairs, road closure with detour, 9/16/19 - 9/17/19.

  • NE 3rd Street between NE Greenwood Avenue and NE Franklin Avenue for Citywide Pedestrian Safety Improvements, periodic lane closures with local access, 9/16/19 - 10/25/19, night work from 10 p.m. - 10 a.m.

  • NE Revere Avenue between Division Street and NE Lytle Street for railroad crossing repairs, road closure with detours, 9/18/19 - 9/20/19. 

Work schedules are dependent on weather conditions and other factors. 

Contact: Kyle Thomas, Construction Manager

541-323-8519, kthomas@bendoregon.gov

 

For Street Preservation related questions: Paul Neiswonger, Streets Supervisor

541-317-3035, pneiswonger@bendoregon.gov

 

Closures and detours in Bend are updated weekly at: www.bendoregon.gov/traffic 

Find more information about street operations at: www.bendoregon.gov/streetpreservation 

Weekly reports can be received via email by subscribing to Weekly Road and Traffic Reports at: www.bendoregon.gov/enews

 

ADA wheelchair icon.Accommodation Information for People with Disabilities  

To obtain this information in an alternate format such as Braille, large print, electronic formats, etc. please contact Anne Aurand at 541-388-5573 or aaurand@bendoregon.gov.

Return to full list >>
Footer Broken Top Three Sisters

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer

If you need assistance with any document, form, etc.,
you may request assistance from the Accessibility Program.