eNotification Signup | Change eNotification Preferences
Please correct the fields below:
To change your eNotification preferences, please submit your email address. You will be sent a link to change and confirm your preferences.

Weekly Road and Traffic Report

Print
Press Enter to show all options, press Tab go to next option

Keep up-to-date on weekly closures and detour routes during peak construction season.


During peak construction season—typically April through October—we send out weekly road and traffic reports each Friday to help members of our community plan the quickest, safest and most reliable routes to their destinations. The weekly report is intended to provide information about various projects within City limits that impact the roadways.

 


TRAFFIC IMPACT LOCATIONS

The map below shows lane and road closures on arterials and collectors and full closures on residential streets.

Click and drag to navigate the map, or use the + or – buttons to zoom. For information about a specific, highlighted project on the map, click it and a pop-up window will appear that contains detailed information.


WEEKLY ROAD AND TRAFFIC REPORTS

Weekly Road and Traffic Report for the Week of July 8 – 14

Post Date:07/05/2019 1:34 PM

 Weekly Road and Traffic Report 

Special Events

 

  • Summer Fest will be held from July 12 – 14 and will close the following:
    • NW Oregon Avenue between NW Brooks Street and NW Bond Street
    • NW Oregon Avenue between NW Bond Street and NW Lava Road
    • NW Minnesota Avenue between NW Wall Street and NW Bond Street
    • NW Minnesota Avenue between NW Bond Street and NW Lava Road
    • NW Wall Street between NW Greenwood Avenue and NW Franklin Avenue
  • Deschutes Dash will be held on July 14 from 7 a.m. - 11 a.m. and close the following:
    • SW Century Drive between Skyline Ranch Road and SW Colorado Avenue
    • SW Colorado Avenue between SW Century Drive and SW Columbia Street
    • SW Columbia Street between SW Colorado Avenue and SW Shevlin Hixon Drive

 

For the Week of July 8 – 14       

 

  • Brosterhous Road between American Lane and News Lane for infrastructure installation, road closure with detours, 7/8/19 - 8/1/19.
  • SE White Tail Street between Brosterhous Road and Brentwood Avenue for infrastructure installation, road closure with detour, 7/8/19 - 8/1/19.
  • SE 3rd Street between Murphy Road and Badger Road for bus stop installation, northbound lane shifts and center turn lane closures, 7/10/19 - 7/11/19.
  • City of Bend Residential Slurry Seal street restoration will take place within multiple neighborhoods. Residents within the project areas will receive notification of dates and times for temporary street closures via reader boards and barricades. Restoration work will occur in the Aspen Rim, West Park, Forest Meadow, Quail Pine Estates, Pine Ridge Estates, River Canyon Estates, and streets between China Hat Road and Murphy Road and Parrell Road and Highway 97.

     

     

    Ongoing Closures:

     

  • NE 4th Street between NE Addison Avenue and NE Xerxes Avenue for infrastructure installation, road closure with detour, 6/10/19 - 7/12/19.
  • Eagle Road between NE Neff Road and NE Monte Vista Lane for infrastructure installation, northbound lane closure with detour, 6/10/19 - 7/14/19.
  • The intersection of Empire Avenue and Purcell Boulevard will be closed to complete the construction of a new roundabout at this intersection. Access to Terrango Glen and Lava Ridges neighborhoods will be maintained during construction. Detours will be signed and a map showing these detours will be issued in future outreach efforts. Please be aware of construction speed limit changes in this area.
  • Brosterhous Road between Whitetail Street and Franke Lane for infrastructure installation, road closure with detour, 6/24/19 - 7/8/19.

 

 

Work schedules are dependent on weather conditions and other factors.

 

Contact: Kyle Thomas, Construction Manager

541-323-8519, kthomas@bendoregon.gov

 

For Street Preservation related questions: Paul Neiswonger, Streets Supervisor

541-317-3035, pneiswonger@bendoregon.gov

 

Find more information about street operations at: www.bendoregon.gov/streetpreservation

Weekly reports can be received via email by subscribing to Weekly Road and Traffic Reports at www.bendoregon.gov/enews

 

Closures and detours in Bend are updated weekly at: www.bendoregon.gov/traffic

 

 ADA wheelchair icon.

Accommodation Information for People with Disabilities  

To obtain this information in an alternate format such as Braille, large print, electronic formats, etc. please contact Anne Aurand at 541-388-5573 or aaurand@bendoregon.gov.

 

Return to full list >>
Footer Broken Top Three Sisters

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer

If you need assistance with any document, form, etc.,
you may request assistance from the Accessibility Program.