Weekly Road and Traffic Report

Print
Press Enter to show all options, press Tab go to next option

Keep up-to-date on weekly closures and detour routes during peak construction season.


During peak construction season—typically April through October—we send out weekly road and traffic reports each Friday to help members of our community plan the quickest, safest and most reliable routes to their destinations. The weekly report is intended to provide information about various projects within City limits that impact the roadways.

 


TRAFFIC IMPACT LOCATIONS

The map below shows lane and road closures on arterials and collectors and full closures on residential streets.

Click and drag to navigate the map, or use the + or – buttons to zoom. For information about a specific, highlighted project on the map, click it and a pop-up window will appear that contains detailed information.


WEEKLY ROAD AND TRAFFIC REPORTS

Weekly Road and Traffic Report for the week of April 29-May 5

Post Date:04/26/2019 11:46 AM

For the Week of April 29 – May 5

  • NW 11th Street between NW Newport Avenue and NW Milwaukee Avenue for street paving, road closure with detour, 4/30/19 – 5/3/19, 7 a.m. – 4 p.m.
  • NE Purcell Boulevard between Spinnaker Street and Rock Park Drive for curb installation, northbound lane closures with flagging, 4/29/19 – 5/3/19, 9 a.m. – 3 p.m.

  • SE Airpark Drive between SE Soft Tail Loop and Thomas Drive for waterline installation, road closure with detours, 4/29/19 – 5/14/19.

  • NE 6th Street between NE Greenwood Avenue (US Hwy 20) and NE Majesty Lane for asphalt speed hump installation, pavement markings, and concrete work at several intersections, rolling one block closures and detours along with day time flagging, 4/29/19 – 6/15/19.

 

Ongoing Closures:

  • NW Rocklyn Road between NW Drake Road and NW Glen Road for waterline installation, road closure with detour, local access only, until 4/30/19, 7 a.m. - 4 p.m.
  • O.B. Riley Road between Mathers Road and Cooley Road for infrastructure installation, road closure with detour, until 5/10/19.

  • Brosterhous Road between American Lane and Jacklight Lane for sewer main installation, southbound lane closures with detours, until 7/15/19, 7 a.m. - 7 p.m.

 

Upcoming Closures:

  • SE Cessna Drive between SE Piper Drive and SE Craven Road for waterline installation, road closure with detour, 5/20/19 – 6/6/19.
  • The intersection of Empire Avenue and Purcell Boulevard will be closed to complete the construction of a new roundabout at this intersection.  The closure will begin on Monday, June 17th and will last approximately 8 weeks.  Access to Terrango Glen and Lava Ridges neighborhoods will be maintained during construction.  Detours will be signed and a map showing these detours will be issued in future outreach efforts. Please be aware of construction speed limit changes in this area.

 

Work schedules are dependent on weather conditions and other factors. 

 

Contact: Kyle Thomas, Construction Manager

541-323-8519, kthomas@bendoregon.gov

 

For Street Preservation related questions: Paul Neiswonger, Streets Supervisor

541-317-3035, pneiswonger@bendoregon.gov

Closures and detours in Bend are updated weekly at: www.bendoregon.gov/traffic

Find more information about street operations at: www.bendoregon.gov/streetpreservation

Weekly reports can be received via email by subscribing to Weekly Road and Traffic Reports at www.bendoregon.gov/enews

Return to full list >>
Footer Broken Top Three Sisters

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.