Murphy Corridor Improvements

Print
Press Enter to show all options, press Tab go to next option
Murphy Improvements

Constructing a complete east-west arterial is anticipated to address safety concerns, connectivity, and mobility issues in southeast Bend.


Construction icon.

PROJECT UPDATES
Add user icon.

SIGN UP FOR
NOTIFICATIONS
Calendar icon.

SCHEDULE

The Murphy Corridor Improvements Project, which is funded through construction, is part of the City of Bend's Transportation Plan and aligns with City Council's goal to improve the movement of people and products around Bend efficiently, safely, and reliably.

Murphy Road is a busy collector route located in Southeast Bend. The project includes transportation improvements along the existing corridor from Parrell Road to Brosterhous Road and the extension of Murphy Road from Brosterhous Road, over BNSF Railway, connecting to 15th Street at Golden Gate Place.

If you have specific questions or concerns, please don't hesitate to call the project phone line (541) 322-9919.


Upcoming Open House Information

An open house prior to construction of the 15th Street roundabout and sidewalk extension will be held Tuesday, August 6th between 9 a.m. - 11 a.m. and 5 p.m. - 7 p.m., at the Murphy Project Staging Area, directly across from entrance of The Bridges at Shadow Glen Neighborhood, 61155 SE 15th Street, Bend. Parking will be available in the open field west of 15th Street.

 


PROJECT LOCATION

Project Map Key

PROJECT BENEFITS

Mobility icon.

Mobility

Addition of railway overcrossing to reduce delays and significantly improve emergency medical services and fire response times for citizens.
Road icon.

Connectivity

Improved traffic connectivity to adjoining streets, parks, and schools.
Siren icon.

Safety

Improved visibility at intersections and designated crossings, reduced conflict points for vehicles, bicyclists, and pedestrians.

PROJECT UPDATES

Murphy Corridor Open House

March 14, 2019 - Jewell Elementary School Library

Post Date:03/01/2019 10:46 AM
Open House flyer
Return to full list >>

SIGN UP FOR PROJECT UPDATE NOTIFICATIONS


WORK COMPLETED TO DATE

Corridor Study completed: 2008 (construction funding reprioritized and project postponed)

Murphy Road Interchange completed: 2015

City Council approves project funding: June 2018

City Council awards preconstruction design contract to K&E/Hamilton: December 2018


PROJECT SCHEDULE

Murphy Corridor Improvements project schedule from 2019 through 2021. Survey activites and geotechnical design: Jan through June 2019. Project open house: Mar 2019. Preliminary design: Jan through Sept 2019. Open house on preliminary design options: June 2019. Design of 15th Street Roundabout, East Extension Grading, 15th Street Sidewalk, and High School Waterline Loop: Feb through Aug 2019. Open house on preconstruction: Aug 2019. Construction of 15th Street Roundabout, East Extension Grading, 15th Street Sidewalk, and High School Waterline Loop: Feb through Aug 2019. Design remainder of corridor, infrastructure details by Aug 2019: Aug 2019 through Aug 2020. Corridor modernization and right of way meetings: Oct 2019 through Aug 2020. Open house on corridor design: Jan 2020. Construction of corridor, sequencing details by Aug 2019: Apr 2020 through Aug 2021.

DOCUMENTS

Footer Broken Top Three Sisters

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.