Weekly Road and Traffic Report

Print
Press Enter to show all options, press Tab go to next option

Keep up-to-date on weekly closures and detour routes during peak construction season.


During peak construction season—typically April through October—we send out weekly road and traffic reports each Friday to help members of our community plan the quickest, safest and most reliable routes to their destinations. The weekly report is intended to provide information about various projects within City limits that impact the roadways.

 


TRAFFIC IMPACT LOCATIONS

The map below shows lane and road closures on arterials and collectors and full closures on residential streets.

Click and drag to navigate the map, or use the + or – buttons to zoom. For information about a specific, highlighted project on the map, click it and a pop-up window will appear that contains detailed information.


WEEKLY ROAD AND TRAFFIC REPORTS

Weekly Road and Traffic Report

Post Date:07/06/2018 11:41 AM

 

Weekly Road and Traffic Report

 

Special Events:

 

  • Summer Fest, July 13 – 15, will take place in Old Downtown Bend and will close the following streets:
    • Friday
      • Minnesota Avenue between Bond Street and Lava Road
      • Oregon Avenue betweenWall Street and Bond Street
    • Saturday – Sunday
      • Wall Street between Greenwood Avenue and Franklin Avenue
      • Oregon Avenue between Brooks Street and Bond Street
      • Oregon Avenue between Bond Street and Lava Road
      • Minnesota Avenue between Wall Street and Bond Street
      • Minnesota Avenue between Bond Street and Lava Road
  • Deschutes Dash, July 14 from 6 a.m. – 1:30 p.m., will have significant impact on Century Drive and Columbia Street, please follow detours and flagger directions, road closures with local access only:
    • Century Drive between Skyline Ranch Road and Reed Market Road
    • Century Drive between Reed Market Road and Colorado Avenue
    • Colorado Avenue Century Drive and Columbia Street
    • Columbia Street between Colorado Avenue and Shevlin Hixon Drive

 

For the week of:

July 9 – 15 

 

  • Logsden Street between Woodland Boulevard and Glenwood Drive for railroad crossing paving work, road closure with detour, 7/9/18 – 7/13/18, 7 a.m. – 7 p.m.
  • Scott Street between Highway 97 ramp and Aune Street for asphalt paving work, single lane closures with flaggers, 7/10/18 – 7/13/18, 7 a.m. – 5 p.m.
  • Eighth Street between Bennington Way and Ravenwood Drive for water and sewer services installation, single lane closures with flagging, 7/11/18 – 7/13/18, 7 a.m. – 6 p.m.
  • Poplar Street between Brookswood Boulevard and Lodgepole Drive for street preservation work, grind and inlay paving, road closure with detour, 7/9/18 – 7/13/18, 7 a.m. – 5 p.m.
  • Lodgepole Drive between Brookswood Boulevard and Poplar Street for street preservation work, grind and inlay paving, road closure with detour, 7/9/18 – 7/13/18, 7 a.m. – 5 p.m.

 

Ongoing Closures:

 

  • 14th Street between Galveston Avenue and Newport Avenue for work on the 14th Street Reconstruction Project, full road closure (southbound and northbound lanes) with detours in place. For project and detour info: www.bendoregon.gov/14thstreeet.
  • Roosevelt Avenue between Silver Lake Boulevard and Taft Avenue for water main replacement, road closure with local traffic access only, detours marked for thru traffic,anticipated end in early August. For project and detour info: www.bendoregon.gov/government/departments/utilities/capital-projects/roosevelt-water-main-replacement-project-phase-2.
  • Rumgay Lane between Butler Market Road and Quiet Canyon Drive for utilities installation, curbs, and paving, road and lane closures, local access only, 6/11/18 – 7/13/18.
  • Egypt Drive between 18th Street and Ranch Village Drive for City of Bend Egypt Water Line Project, road and lane closures, 6/15/18 – 8/26/18.
    • Access to Rockridge Park will be maintained by entering on the west side of Egypt Drive off of Ranch Village Drive, starting on July 10th.

 

Upcoming Closures:

 

  • Mt. Washington Drive between Shevlin Park Road and Chandler Avenue for pavement milling, 7/15/18 – 7/19/18, night work from 7 p.m. – 6 a.m.

 

Work schedules are dependent on weather conditions and other factors.

 

Contact: Kyle Thomas, Construction Manager

541-323-8519, kthomas@bendoregon.gov

 

Return to full list >>
Footer Broken Top Three Sisters

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer

If you need assistance with any document, form, etc.,
you may request assistance from the Accessibility Program.