News

Print
Press Enter to show all options, press Tab go to next option

For the latest City news, you've come to the right place.

Horizon line composed of Mt Bachelor, Broken Top and the Three Sisters

Looking for a particular news article? Try out the search box below.

Just want to look at news related to a specific department or topic? Use the drop-down boxes to narrow your search.

Sign up here to have the City news delivered right to your inbox.

27th Street Sewer Line Project Update

New Traffic Changes

Post Date:03/01/2017 6:10 PM

Work continues throughout the 27th Street corridor including isolated areas of paving. Approximately 5,000 feet of the sewer pipe has been installed in this construction phase. 

There will be several traffic shifts as the work continues. 

Daytime construction for sewer installation on Neff Road between Medical Center Drive and 27th Street is scheduled to begin Monday, March 6. The westbound lane on Neff Road between Medical Center Drive and 27th Street will be closed to all traffic.  Detours will be signed to direct westbound travelers to Butler Market Road or Hwy 20 depending on the approach direction to Neff Road.  All accesses to St Charles remain open.  Specifically, access from the east is made at Medical Center Drive or Conners Avenue. Follow the blue hospital signs.

Please travel slowly in these areas for your safety and for the safety of the workers.

The 27th Street Sewer Line is part of the Southeast Interceptor, an infrastructure addition to the City’s sewer collection system that will provide relief to capacity issues around Bend.

SEI provides much needed enhancements to the city’s sewer collection system. Benefits include:

  • Increased collection system capacity
  • The availability of gravity sewer service to hundreds of homes that are currently on septic systems
  • The opportunity to decommission several sewer pump stations 

The City of Bend protects drinking water sources, public health, and the environment by conveying and treating wastewater from throughout the City.

Project information can be found at www.bendoregon.gov/SEI

Return to full list >>